This session was presented by Steve Freeman and Nat Pryce. It's purpose was to allow all project stakeholders to explore what needs to be done before agile development can commence. The session synopsis posed a number of thought provoking questions:
The session kicked off with a cafe-style brainstorming session where groups of people sitting around tables shared their experiences, and identified things that were in place at the start of a project and things that were missing. These were written on colour coded index cards to reflect 'good' and 'bad'. The group then scattered the cards on the floor and, working collectively, started to group them logically.


Grouping the cards
Originally uploaded by sjb140470.


The logical groups that emerged were:
Each group of index cards was then collected by Nat and returned to a table.



Collecting the grouped cards
Originally uploaded by sjb140470.



The people sitting at each table were responsible for distilling the information and creating a poster that presented a list of items, for the given topic, that should be in place before iteration zero. People then circulated around the tables to discuss each poster.


Paul Beckford tells Tim Lister how big his 'Dead Fish' was
Originally uploaded by sjb140470.


Here are the posters:


analysis
Originally uploaded by sjb140470.

buildandtest
Originally uploaded by sjb140470.

infrastructure
Originally uploaded by sjb140470.

managingexpectations
Originally uploaded by sjb140470.

projectgovernance
Originally uploaded by sjb140470.

teambuilding
Originally uploaded by sjb140470.



Tags: , , ,

0 Comments:

Post a Comment

Links to this post:

Create a Link

<< Home